Transformer - Add transformer cache/sync logic
As a geospatial cache administrator, I'd like to schedule jobs to update from or synchronize my cache with the core OSDU datasets. The GCZ Transformer should include configurable scheduling logic for each dataset. When the Transformer starts-up, it should read a scheduling configuration and schedule updates for the datasets.
Acceptance criteria:
- Develop a configurable solution that works for all datasets using an existing Java scheduler (e.g. quartz)
- The scheduler successfully updates the cache at the configured times.