Merge branch 'feature/GONRG-2101_logs_gcp' into 'integration-master'

GONRG-2101 Changed log level.

Closes GONRG-2101

See merge request go3-nrg/platform/System/notification!43
3 jobs for !70 with log-level-gcp in 34 minutes and 25 seconds (queued for 1 second)
latest detached
Status Name Job ID Coverage
  .Pre
failed deprecated-pipeline-include #283055
allowed to fail

00:02:01

 
  Review
failed trigger-trusted-tests #283086
osdu-small

00:32:23

failed trigger-trusted-tests #283056
osdu-small

00:00:34

 
Name Stage Failure
failed
trigger-trusted-tests Review
Pipeline Status: running
Pipeline Status: running
Pipeline Status: running
Pipeline Status: running
Pipeline Status: running
Pipeline Status: running
Pipeline Status: running
Pipeline Status: failed
ERROR: Job failed: exit code 1
failed
deprecated-pipeline-include .Pre
Removing testing/notification-test-gcp/target/
Removing testing/notification-test-ibm/target/

Skipping Git submodules setup
Executing "step_script" stage of the job script
$ echo "$DEPRECATED_MSG"
The FOSSA scanner now supports different build environments, which should be specified directly. Consider using fossa-maven.yml instead.
$ /bin/false
ERROR: Job failed: exit code 1