This project is archived. Its data is read-only.

A discussion about the nature of the Realization relationship between Material and Equipment

"Material Realizes Equipment" has no further elaboration in the standard, so I assume it means "an inactive equipment" (not in operation).

If this is true, that would lead to "Material Realizes Device" also true (an IT device not in operation).

Assignee Loading
Time tracking Loading